During the summer months, the Skicircus Saalbach Hinterglemm Leogang Fieberbrunn again invests to ensure even more comfort for all winter sport fans.
New from Winter 26/27
D1 Reiterkogel
COMING WINTER: UP TO THE PEAK
With the construction of the new D1 REITERKOGEL lift in Hinterglemm, a significant increase in comfort and quality is expected this coming winter. The existing lift, built in 1997, will be replaced by a modern 10-seater monocable gondola lift – identical in construction to the 12er KOGEL lift.
A special highlight is the new second section, which will enable direct travel to the summit in future. With a capacity of up to 2,500 people per hour, fast and comfortable transport to the mountain is guaranteed.
The Reiterkogel is a real family mountain in both summer and winter: clearly laid out, varied and with a wide range of activities for young and old.
Facts:
- System type: 10 EUB - Doppelmayr company
- Start of construction: April 2026
- Completion: November 2026
- Capacity: 2,500 persons per hour
- Length: 2111 m
- Speed: 6 m/sec
- Height difference: 669 m
- Travel time: 8,61 min
- Number of cabins: 71